Shongar, Azerbaijan
Drill Cuttings Treatment Facility
Engineered and built in 2020 to process synthetic drill cuttings. The facility has processed hundreds of thousands of tons of material at approximately 6 to 8 tons per hour.

Shongar, Azerbaijan
Engineered and built in 2020 to process synthetic drill cuttings. The facility has processed hundreds of thousands of tons of material at approximately 6 to 8 tons per hour.
Salyan, Azerbaijan
Processing sludge from five oil-sludge lakes, with work involving sludge processing, soil cleaning, wastewater treatment and recovery of finished oil.
Samara, Russian Federation
A mobile centrifuge plant processes a range of refinery wastes and legacy lagoon sludge at more than 1,000 barrels per day.